Tunnel de Gilamont en Suisse avec une machine de projection

GILAMONT TUNNEL

Gilamont hydroelectric power station in Switzerland

A new tunnel of about 800 meters length and 3.8m height is to be excavated so that the Gilamont hydroelectric plant can supply
some 800 households in the Vevey region of
Switzerland.

HONGRIN TUNNEL

Rehabilitation of the Hongrin hydroelectric gallery in Switzerland

The Hongrin hydroelectric tunnel is located in the Vaud Pre-Alps in Switzerland. This tunnel with a diameter of about 2.5m and a length of 6 km was structurally rehabilitated with shotcrete.

Tunnel de Hongrin en Suisse

Customer testimonials

"Using less concrete during construction means a smaller carbon footprint, lower costs, and an increased productivity. The solution devised by MOBBOT –does just that. This is a model IoT example that is changing the construction industry with pioneering spirit and foresight."

"Using less concrete during construction means a smaller carbon footprint, lower costs, and an increased productivity. The solution devised by MOBBOT –does just that. This is a model IoT example that is changing the construction industry with pioneering spirit and foresight."

RES WITSCHI

Delegate for Sustainable Digitalization

"The advantages of this technique are the minimization of joints between the elements and therefore better sealing, the use of high quality concrete and the reactivity of the solution."

"The advantages of this technique are the minimization of joints between the elements and therefore better sealing, the use of high quality concrete and the reactivity of the solution."

PATRICE BERSIER

Project Manager

RWB Groupe SA

"Mobbot solutions allowed us to customize each element, to reduce the amount of concrete by 25% and to improve the safety and ergonomics of work on the site."

"Mobbot solutions allowed us to customize each element, to reduce the amount of concrete by 25% and to improve the safety and ergonomics of work on the site."

MARTIN DUSSOUCHET

Project Manager

Losinger Marazzi SA

“This solution allowed us to reduce to 2 hours a job that would have taken us 2 days. My life was simplified, I was able to optimize resources and planning of work."

“This solution allowed us to reduce to 2 hours a job that would have taken us 2 days. My life was simplified, I was able to optimize resources and planning of work."

CRISTOPHE FISCHER

Head of department

Axians SA

“Mobbot can be quick and fast. Fast reactions resulted in quick insights, that completely fulfilled the main objective of our proof of concept."

“Mobbot can be quick and fast. Fast reactions resulted in quick insights, that completely fulfilled the main objective of our proof of concept."

MAGDALENA STELZER

Director of the Digital Planning Program

Tiefbauamt der Stadt Zürich

"Thanks to Mobbot, we were able to gain visibility on our concrete spraying operations and were thus able to take corrective actions."

"Thanks to Mobbot, we were able to gain visibility on our concrete spraying operations and were thus able to take corrective actions."

GILLES LEQUERTIER

Managing Director

Infra Tunnel SA

Témoignages
bottom of page